Condor and Tirana Great Ring Road

Tirana ring road project is estimated to be finalized by 2022. The whole junction will be 18 kilometers long and has been classified as an urban highway.
In detail, Condor supplied Comax systems to withstand high casting pressures, and a special steel formwork for the double-curved pier and cap. Designed and developed according to the specific needs of the construction site. On top of that, Condor technicians offered their assistance on site to oversee the proper application of the system.

Advantages:

  • PRE- & POST-SALES SERVICE: we walked the customer through every phase, from sale to termination of work, with a dedicated team of experts
  • SIMPLE USE: all the formwork systems were supplied pre-assembled, so that the operators on site only had to install and adjust them