𝗖𝗼𝗻𝗱𝗼𝗿 F𝗼𝗿𝗺𝘄𝗼𝗿𝗸 𝗳𝗼𝗿 𝘁𝗵𝗲 𝗰𝗼𝗻𝘀𝘁𝗿𝘂𝗰𝘁𝗶𝗼𝗻 𝗼𝗳 𝘁𝗵𝗲 𝗥𝗡𝟭 𝗧𝗿𝗮𝗻𝘀-𝗦𝗮𝗵𝗮𝗿𝗮 𝗛𝗶𝗴𝗵𝘄𝗮𝘆

The project is a portion of a broader network for the 𝐓𝐫𝐚𝐧𝐬-𝐀𝐟𝐫𝐢𝐜𝐚𝐧 highway, and will connect Algiers to Lagos (4,504 km), significantly facilitating road traffic between North and South West Africa.
The high number of piles and pier caps, for the stretch of the Algerian Saharan desert, required formwork systems that reduced assembly and disarming times as a matter of course, without compromizing the quality of concrete that a project of this scale requires.

𝗜𝗻 𝗱𝗲𝘁𝗮𝗶𝗹𝘀:

FAST MOUNTING: ensured by COMAX Formwork , SRC 240 and OMNI systems pre-assembled and/or assembled directly on site
SIMPLE DISARMING: the hydraulic ramping system, manufactured according to the design requirements, has remarkebly reduced the manufacturing cycle

Condor
Formwork
The best way to stay updated on the Condor world. Download it now!

Stay updated

Sign up for our newsletter today to receive industry alerts, news and insights from Condor.

Subscribe